restruction.com
Sun Devil Stadium Structural Repairs Phase One
Sun Devil Stadium, located on the campus of Arizona State University, was experiencing the deterioration of fourteen concourse support beams and two grandstand location beams. Poor detailing during initial construction caused the corrosion of these steel beams. Subsequent stadium washdowns allowed water to penetrate to the beam tops, which then triggered the corrosion. The concourse