goaptus.com
Elvira
Bridge 407.8, Elvira, AL Installation of 750+ LF of bridge-attached, 4” schedule 40, galvanized steel conduit; add additional rollers and hardware to hanger assembly; and add pipe supports with galvanized clamps at wing wall core drills.