goaptus.com
Fort Robinson Bridge
Kingsport During this complete remediation, Aptus cleaned, primed and wrapped143’ of 4” gas main with grey/silver wax tape, installed thirteen 6” hot-dipped galvanized yoke style hangers containing non-conductive rollers and allnew hardware, installed fiberglass shields at each hanger location and installed fill putty at the abutments. The pipe was then inspected to ensure no loss