csengineermag.com
Deep storm water drainage system succeeds due to high performance pipe - Civil + Structural Engineer magazine
An Arizona value-engineered road expansion project found that high performance pipe provided cost savings and fast installation for the new storm water drainage system buried as deep as 21 feet. Authored by: