thesource.metro.net
Operating plan proposed for Orange Line Extension - The Source
Metro is currently putting the finishing touches on the four-mile extension of the Orange Line from the Canoga station to the Chatsworth Metrolink station. The project is expected to open in June. The above maps show the plan that Metro staff is recommending for the Orange Line. The Metro [continue reading]