nl4worldbank.org
eC2:Preparation of Feasibility Level Design and Cost Estimate of the Access Road for the Naoro-Brown Hydropower Project
Deadline: 16-Feb-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) The objective of this assignment is to prepare a feasibility level design for the proposed (approximately) 60km section of the …