deltabeach.wordpress.com
RM Proceeds with Tenders to Repair the Channel and Breakwater
The efforts to repair the channel and breakwater from damage sustained in the 2011 and 2014 floods, have proceeded from the design stage to the construction stage. The RM engaged AECOM to design th…