cdiver.net
Basslink Subsea Cable Fix to Take Longer than Expected - cDiver
Basslink, a subsea cable connecting George Town in Tasmania and Loy Yang in Victoria, will experience additional 30-day outage, Tasmanian Government said Thursday. The fault in subsea cable was discovered on December 20, 2015, and the owner, Basslink, informed that the possible fault was approximately 100km off the Tasmanian coastline in Bass Strait. Parallel with... Continue Reading »