blogs.esa.int
Successful integration of the upper composite, containing MetOp-B and the Fregat, with the Soyuz Block I
Taken from EUMETSAT, 12 September The mechanical integration of the Upper Composite with Soyuz Block was performed successfully on 11 September, and electrical tests are now underway. Weighing abou…