irion-edm.com
Energy Production Planning for AXPO
The Challenge Before adopting Irion, Axpo's energy production planning was a manual process that involved many operators. The Toller Process Optimization (TPO) was constantly on hold to be able to read information from the energy distribution site manager. Data accuracy had to be verified, file