hydrocarbonwell.com
July 30, 2019 Hydrocarbon Well Services Turn Key Plugging and reclamation of well sites
On July 31, HWS ran bond log inside 5.5" casing, bond log showed casing was bonded. Perforate as directed, trip in and set cement plug. Hauled back to shop on our way in the hydraulic unit, pumps, elevators, and tools we were done with.Tomorrow will check plug and set plug on well in WV.