hydrocarbonwell.com
July 24, 2019 Hydrocarbon Well Services Rigged up to plug wells with cement
On July 24, HWS milled on the 5.5" casing and got topped dressed up. Change out bit to 4 3/4" concave mill and start in hole, sat down at 33' and ready to mill on blockage on the well in WV. On July 24, HWS got the 3" tubing to blow down, checked td and scheduled wir