hydrocarbonwell.com
Hydrocarbon Well Plugging Work 6/17/2019
On June 17 HWS began site prep on the nw well. Hauled rig mats down to pad over gas line. On June 17, HWS set cement plug back up to 1100', tripped out of hole (TOOH) with work string on the PA Eqt well. On June 17, HWS placed cutting box inside pit, circulated pit through cutting b