hydrocarbonwell.com
Hydrocarbon Well Plugging update
Set plugs today, will try to cement back tomorrow from 650' to surface. Ohio milled down to 1318' with the 4.5" casing, not going good, they think the tubing is twisting up inside the 4.5". Plan tomorrow is set cement plug at that depth. Got two loads oil hauled today, tank off