hydrocarbonwell.com
Hydrocarbon Well Plugging 7/2/2019
On July 1, HWS tripped in hole (TIH) to 1769' mixed and pumped 6 (bbl) barrel of gel, then set a balanced class A cement plug from 1769 to 1625, displaced plug with 4 (bbl) gel. Trip out of hole (TOOH) on the Eqt WV well. On July 1, HWS mobilized drill string and power swivel unit a PA wel