eeocipa

collectivehistory: Puppets of Hitler and Goebbels from the Polish Army in the Soviet Union Puppet Theatre, 1942

collectivehistory: Puppets of Hitler and Goebbels from the Polish Army in the Soviet Union Puppet Theatre, 1942

It’s not very often that I receive good news through a FOIA request. Usually I am aggravated and my blood pressure rises after reading the agency emails. So I’d like to share this email with you. It is a summary of a teleconference between NIOSH, DOL, DOE and Boeing regarding non-Area IV workers at the Santa Susanna Field Laboratory. Thank you D’Lanie Blaze for your persistence in supplying the arguments and documents to prove other SSFL workers should be covered. http://eecap.org/…/Santa%20Susa…/2014_SSFL_NIOSH_rad_exp.pdf

”Judo instruction is one of the high spots in the life of the latest addition to the Leatherneck Marines here. An instructor shows a recruit how to make the enemy’s bayonet useless. Cpl. Arvin Lou Ghazlo, USMC, giving judo instructions to Pvt. Ernest C. Jones, USMCR.” Montford Point Camp, NC. April 1943.

worldwar-two:  ”Judo instruction is one of the high spots in the life of the latest addition to the Leatherneck Marines here.

http://www.youtube.com/attribution_link?a=hWmlvYPBG0CfZ8Wg9I_i_A&u=/watch?v=GGV-mVDlQvc&feature=share

http://www.youtube.com/attribution_link?a=hWmlvYPBG0CfZ8Wg9I_i_A&u=/watch?v=GGV-mVDlQvc&feature=share

View On WordPress

http://www.youtube.com/attribution_link?u=/watch?v=d4UFn27gjOg&feature=share&a=mON_9EkTsrX8PX99VgmRIQ

Jack Kennedy courts Jacqueline Bouvier

http://www.youtube.com/attribution_link?u=/watch?v=d4UFn27gjOg&feature=share&a=mON_9EkTsrX8PX99VgmRIQ

View On WordPress

Table 6-1 0. Selection of neutron radiation energies and associated dose fractions for the I ! RTG building 400 Pinellas Plant processes.

Table 6-1 0. Selection of neutron radiation energies and associated dose fractions for the I ! RTG building 400 Pinellas Plant processes.

Table 6-1 0. Selection of neutron radiation energies and associated dose fractions for the
I
! RTG building 400 Pinellas Plant processes.
Table 6-1 1. Photon and beta dosimetry missed dose by facility or location.
ICRP 60
Factor
0.48
Facllity or Locatlona
Building 100. Areas 107. 108. 109,
132M. 155. 1571158, 182, 191
Buildings 200
Building 100. Areas 107, 108, 109,
132M. 155,1571158,182, 191
Defa…

View On WordPress